Seamless eBOM → mBOM
Engineering changes sync into manufacturing instantly, with no manual re-entry.
Ensure continuous information flow between engineering and manufacturing — create and manage digital process plans, manufacturing resources, standards, and visual work instructions.
MPM closes the gap between the engineering BOM (eBOM) and manufacturing BOM (mBOM); it establishes process plans, material requirements, and equipment resources.
Dynamic visual work instructions are linked to lightweight CAD data, ensuring workers always receive the latest documentation.
When integrated with MES, MPM becomes the backbone of the Smart Factory: every engineering change is instantly reflected on the shop floor.
−40%
Production preparation time
−60%
Errors from outdated documentation
+25%
Plant productivity
100%
eBOM ↔ mBOM synchronization
Engineering changes sync into manufacturing instantly, with no manual re-entry.
3D and AR instructions always updated to the latest engineering revision.
Manufacturing KPIs by product line, plant, and shift.
Machines, tools, fixtures, and personnel — all in one schema.
Automatically push mBOM, routings, and standard times down to execution systems.
Simulate 3D lines and optimize layout and takt time before rollout.
Build the mBOM visually via drag-and-drop from the eBOM, adding consumables.
Plan processes by operation, work center, and resource.
Multi-media instructions: images, video, 3D models, AR.
Integrated time standards, MTM, and MOST.
Automatically propose mBOM impact when the eBOM changes.
Manage differing mBOMs per plant / production line.
Display Creo View 3D on the shop floor without full CAD.
Deployed MPM + ThingWorx across 25 plants, cutting product changeover time by 35%.
Applied AR instructions for assembly, cutting new-worker training time by 50%.
Connected suppliers, workers, and machines using MPM + IoT.
No. MPM focuses on manufacturing process 'planning' (mBOM, routing, work instructions). MES handles execution on the shop floor. The two systems integrate and complement each other via the ISA-95 standard.
MPM integrates optimally with Windchill but can receive eBOM data from SAP, Teamcenter, or other PLM systems via a connector.
Yes. Work instructions support multiple languages; NEAX has experience deploying to plants in Vietnam with a fully Vietnamese worker interface.
NEAX is a PTC implementation partner in Vietnam — roadmap consulting, business-driven configuration, training, and operational support.